Free Porn
xbporn

Sunday, September 8, 2024

LATEST ARTICLES

A railway community of 3000 members!

This week end our railway community reached the target of 3000 members! railwaysignalling.eu is going to become one of the most influential railway communities on the web.

ERTMS and safety issues for railway operation

The ERTMS/ETCS equipment ensures safe movement of the equipped train at any time

World’s First Hydrogen Tram in China

The tram runs on hydrogen power via on-board fuel cells. Refuelling takes just three minutes, after which a three-car tram capable of carrying as many as 380 passengers can run for about 100 kilometres.

CBTC Standardization: Mixed Operation on Shared Lines in accordance with ERTMS/ETCS Standards

Is it possible a CBTC standardization in accordance with ERTMS/ETCS ? Provisions have been made to plan for the migration from CBTC systems, to ETCS Level 3

Requirements Management for the development of Safety Critical Systems

Requirements Management is concerned with understanding Customer goals, identifying and specifying the needs of Users and Stakeholders and the transformation of these needs into functions and constraints enabling development of products and services.

SafeRail: level crossing study

Since the SafeRail project set out in 2013 to assess the feasibility of using satellite technology to improve safety at level crossings, the debate over the dangers posed by locations where rail meets the road has only grown. Many countries are working to phase them out, but the cost of replacing them with new infrastructure is often too high to consider except in the most serious cases.

Regulations for Railway Safety Systems

Since the train control systems are critical systems, they must be certified according to strict guidelines, such as CENELEC regulations. These rules govern both the development process and the characteristics of the final product.

Principles of Railway interlocking

In railway signalling, an interlocking (IXL) is a system composed by a set of signal apparatus that prevents trains from conflicting movements through only allowing trains to receive authority to proceed, when routes have been set, lock and detected in safe combinations.

Hitachi Buys Finmeccanica Rail Asset: AnsaldoBreda and Ansaldo STS

Hitachi has reached a binding agreement with the board of Finmeccanica to acquire all of the shares in AnsaldoBreda and the Finmeccanica's 40% stake in Ansaldo STS.

Bombardier Celebrates Innovative Battery Powered Train

The prototype of battery powered train has entered trial passenger service on the Manningtree –Harwich branch

Most Popular

Recent Comments